Website Package

Website Transfer Move and Clean Up

NZD 350 + 15% GST. A careful transfer path for websites, hosting, DNS, SSL, access, and handover clean-up when the current site needs to move or stabilise.

A careful website move with access and launch checks.

Website Transfer helps move or stabilise an existing website while keeping access, DNS, SSL, backups, and launch checks organised.

Access reviewHosting, domain, DNS, and platform checks
Move planTransfer steps and downtime awareness
Clean handoverAdvice on preserve, improve, or rebuild
Website Transfer website sample
Website Transfer planning sample
NZD 350 + 15% GST

Best for moving an existing website

This plan keeps the move organised and helps spot hosting, domain, SSL, email, or access issues early.

  • Access and ownership audit
  • DNS and hosting review
  • Downtime awareness
  • Post-transfer clean-up path

Access review

We identify who controls the domain, hosting, platform, email, DNS, analytics, and any connected tools.

Migration planning

Files, content, database needs, backups, SSL, redirects, and timing are checked before the move is treated as simple.

Risk reduction

The goal is to avoid avoidable downtime, broken forms, missing images, lost access, email disruption, and confusing handover.

Next recommendation

After transfer, we can advise whether the site should be preserved, cleaned up, redesigned, hosted, or maintained.

Included

What Website Transfer includes.

The same inclusions shown on the plans page, with quick notes for what each one means.

01
Current hosting review

The current hosting setup is checked before the move starts.

02
Domain and DNS review

Domain ownership and DNS records are reviewed to reduce launch risk.

03
SSL review

SSL status is checked so the moved site can load securely.

04
Access review

Important logins and ownership details are confirmed early.

05
Transfer planning

The move is planned around files, platform needs, timing, and handover.

06
Backup planning

Backup needs are considered before changes are made.

07
Downtime awareness

The move is planned with awareness of possible downtime or email risk.

08
Post-transfer checks

Public pages, forms, links, SSL, and visibility are checked after the move.

09
Clean-up advice

You get practical notes on what should be cleaned, fixed, or improved next.

10
Optional next-step support

The transfer can lead into hosting, maintenance, redesign, or SEO support.

Page structure

A Website Transfer usually includes these core parts.

Current auditDomain registrar, DNS, hosting, platform, email, plugins, forms, analytics, and admin access.
Transfer planBackups, timing, SSL, DNS changes, platform move, redirects, and support contacts.
Post-transfer checksPublic pages, links, forms, SSL, mobile view, basic SEO visibility, and admin handover.
Next phaseMaintenance, rebuild recommendation, hosting setup, or content clean-up if needed.

Audit access

Check what accounts exist, who controls them, and what can be safely moved.

Plan the transfer

Prepare backups, DNS steps, SSL awareness, platform notes, and timing.

Check after move

Review public pages, links, forms, SSL, basic visibility, and next recommended actions.

Website Transfer request view

What we need for Website Transfer

  • Domain registrar access
  • Hosting or platform login
  • Current provider details
  • Email/DNS notes and any must-avoid downtime windows

Useful add-ons

  • Managed hosting
  • Maintenance package
  • SEO redirect review
  • Website redesign planning
Website Transfer sample visual 1
Website TransferMove and Clean Up
Website Transfer sample visual 2
Bisibly Request PathKeep project context attached to the business account.
Website Transfer sample visual 3
Launch DirectionShow the practical structure before build work deepens.

Ready for Website Transfer?

Get this plan through the portal flow so your plan choice, account details, and website request stay connected from the start.

Get the Plan